NEWS RELEASE
TOWN OF PENETANGUISHENE
*************************
The Town of Penetanguishene and Morden Construction will be installing a drainage pipe on the east side of Bridle Road starting Tuesday.
The project is scheduled to be completed over a period of approximately one week. The project will entail installing drainage pipes, landscaping ditch areas and asphalt gutter installation on the East Side of Bridle Road from 44 to 54 Bridle Road.
We assure residents that in correspondence with COVID-19 protocols, proper precautions will be taken by staff to ensure that health and safety measures are met.
We apologize for any inconvenience that this may cause. If you have any questions or concerns regarding the above please contact Jody Haourt, Road Supervisor, at 705-549-7992 or by email at [email protected].
*************************